Knowledge Network Node

On site assembly technology of box beam of large-span steel bridgeChinese Full Text

SONG Gong-ye;LIU Yu-hui;School of Construction Management,Jiangsu Jianzhu Institute;Technology Research and Development Center,Jiangsu Guangyu Construction Group;

Abstract: In order to solve the problems of joint mismatch and welding deformation in box beam assembly in steel bridge construction,research group carries out studies on hoisting,supporting and placing of curved arch and box beam,setting of stents,as well as shape and material of cushion blocks according to actual requirement of site assembly of box beam of Lanzhou Shenan Yellow River Bridge.Method of joints’ being fixed before welding and removed after welding is used to ensure the welding quality of assemble joints at box beam in steel bridge construction.
  • Series:

    (C) Architecture/ Energy/ Traffic/ Electromechanics, etc

  • Subject:

    Highway and Waterway Transportation

  • Classification Code:

    U445.4

  • Mobile Reading
    Read on your phone instantly
    Step 1

    Scan QR Codes

    "Mobile CNKI-CNKI Express" App

    Step 2

    Open“CNKI Express”

    and click the scan icon in the upper left corner of the homepage.

    Step 3

    Scan QR Codes

    Read this article on your phone.

  • HTML
  • CAJ Download
  • PDF Download

Download the mobile appuse the app to scan this coderead the article.

Tips: Please download CAJViewer to view CAJ format full text.

Download: 100 Page: 1-3 Pagecount: 3 Size: 104K

Related Literature
  • Similar Article
  • Reader Recommendation
  • Associated Author