Application of break-even analysis and earned value management in cost managementChinese Full Text

CHEN Jian;LU Pengfei;DU Honglei;School of Construction Equipment and Municipal Engineering,Jiangsu Jianzhu Institute;Yishusi Bureau Luoma Lake Water Conservancy Bureau;

Abstract: In order to improve cost management level of project engineering,break-even analysis and earned value management are applied in current cost management.We use break-even analysis to carry out cost forecast and establish detailed and feasible cost management plan.Then we use earned value management to carry out analysis and evaluation on cost management.Combing cost management of concrete work in Qiuwei regulator,we make feasible cost management plan.During construction,we discover the cost variance in time and make corresponding adjustment.Finally we realize the profitability of 15.6% which is 5.6% higher than expectation.
  • DOI:

    10.19712/j.cnki.jsjyxb.2015.01.005

  • Series:

    (C) Architecture/ Energy/ Traffic/ Electromechanics, etc

  • Subject:

    Architecture and Engineering

  • Classification Code:

    TU723.3

  • Mobile Reading
    Read on your phone instantly
    Step 1

    Scan QR Codes

    "Mobile CNKI-CNKI Express" App

    Step 2

    Open“CNKI Express”

    and click the scan icon in the upper left corner of the homepage.

    Step 3

    Scan QR Codes

    Read this article on your phone.

  • HTML
  • CAJ Download
  • PDF Download

Download the mobile appuse the app to scan this coderead the article.

Tips: Please download CAJViewer to view CAJ format full text.

Download: 308 Page: 17-20 Pagecount: 4 Size: 96K

Related Literature
  • Similar Article
  • Reader Recommendation
  • Associated Author