Knowledge Network Node

Numerical simulation of under-traversed highway tunnel construction processChinese Full Text

ZHANG Long;HAN Wenjie;TIAN Zu’an;CHEN Jinliang;Department of Theoretical and Applied Mechanics,Chongqing University of Science and Technology;Tunnel Fourth Engineering Company Limited;

Abstract: The highway normal operation is easy to be influenced for the above road surface subsidence induced by the under-traverse tunnel construction.Taking a tunnel construction channel as example,using ABAQUS to simulate the 3 Ddynamic construction process,the influence of tunnel excavation to above highway road surface subsidence is analyzed,the surface subsidence value in all stages of the excavation and supporting structure stress change rule are obtained.Numerical calculation shows that the tunnel excavation will not endanger the normal operation of above highway.
  • DOI:

    10.19712/j.cnki.jsjyxb.2017.02.001

  • Series:

    (C) Architecture/ Energy/ Traffic/ Electromechanics, etc

  • Subject:

    Railway Transportation

  • Classification Code:

    U231.3

  • Mobile Reading
    Read on your phone instantly
    Step 1

    Scan QR Codes

    "Mobile CNKI-CNKI Express" App

    Step 2

    Open“CNKI Express”

    and click the scan icon in the upper left corner of the homepage.

    Step 3

    Scan QR Codes

    Read this article on your phone.

  • HTML
  • CAJ Download
  • PDF Download

Download the mobile appuse the app to scan this coderead the article.

Tips: Please download CAJViewer to view CAJ format full text.

Download: 32 Page: 1-4 Pagecount: 4 Size: 2943K

Related Literature
  • Similar Article
  • Reader Recommendation
  • Associated Author